Customization: | Available |
---|---|
After-sales Service: | Provided |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 330000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
|
Unit
|
Parameter value
|
|
Outline dimension
|
mm
|
12000×2500×3900
|
|
Overall weight
|
kg
|
24500
|
|
Chassis
|
Model
|
|
ZZ5307N4647C
|
Max. speed
|
km/h
|
90
|
|
Max. grade-ability
|
%
|
40
|
|
Wheelbase
|
mm
|
4600+1350
|
|
Tire
|
|
11.00R22.5
|
|
Engine
|
Model
|
|
WD615.96
|
Max. power
|
kW
|
279
|
|
Max. torque
|
N·m/(r/min)
|
1590/1100~1600
|
|
Displacement
|
L
|
9.276
|
|
Emission standard
|
|
Eruo III
|
|
Pumping system
|
Theoretical output
|
m³/h
|
130
|
Concrete pumping pressure
|
MPa
|
8
|
|
Theoretical pumping times
|
Time/min
|
24~27
|
|
Delivery cylinder diameter ×stroke
|
mm
|
φ230×2000
|
|
Max. diameter of pumping concrete
|
mm
|
40
|
|
Filling height
|
mm
|
1580
|
|
Concrete slump range
|
cm
|
8~23
|
|
Placing boom
|
Reach height
|
m
|
29.6
|
Reach depth
|
m
|
18
|
|
Slewingradius
|
m
|
36.5
|
|
Slewing angle
|
°
|
±270
|
|
Unfolding angle of the 1st section
|
°
|
90
|
|
Unfolding angle of the 2nd section
|
°
|
180
|
|
Unfolding angle of the 3rd section
|
°
|
245
|
|
Unfolding angle of the 4th section
|
°
|
235
|
|
Stabilizer span
|
Longitudinal span of stabilizer
|
mm
|
6421
|
Transverse span of front stabilizer
|
mm
|
5430
|
|
Transverse span of rear stabilizer
|
mm
|
7381
|
|
Others
|
Lubrication method
|
|
Automatic lubrication
|
Control method
|
|
Manual/remote control
|
|
Volume of water box
|
L
|
600
|